Frisco Roofing & Siding logoFrisco Roofing & Siding (469) 535-7696

Home › Roof & Siding Pages › Siding Replacement

Siding Replacement in Frisco

On a Frisco house, replacing the siding does not mean wrapping the house. It means the second story, the gables, the dormers and the chimney chase, the parts above the roofline where the ordinance allowed boards instead of brick. This page is about that job.

The upper gable of a brick house with old boards removed, gray house wrap exposed and a few new tan planks started along the bottom, seen from the driveway

In Brief

The siding on a typical Frisco house is fiber cement on upper walls and features over a masonry first floor. Replacement is scaffold and ladder work, measured in squares, not in houses.

Twenty years is when builder-grade boards, their paint and their caulk reach the end together on the 2000s cohort.

Whether siding replacement needs a Frisco permit could not be confirmed from the city's pages. Ask the counter. Your association almost certainly has a say.

What Is Up There

Frisco's zoning ordinance asks for main building facades of one hundred percent masonry, with fiber cement siding permitted on up to fifty percent of stories other than the first where it sits above the roofline, and on architectural features including window box-outs, bay windows and roof dormers. Builders in the 2000s and 2010s took that allowance: brick to the top of the first-floor windows or the eave, then fiber cement planks on the gable ends and the upper story facing the back and sides.

So a siding replacement in Frisco is typically eight to twenty squares on a two-story house, all of it reached from a ladder, scaffold or the lower roof. That makes access and roof protection a bigger share of the price than on a fully sided house elsewhere.

City of Frisco Zoning Ordinance, Chapter 63, Subsection 4.07.09 (Ordinance 2021-07-47), as published on eCode360, read October 2026. The share of a house that is siding varies by builder and plan and is not sourced; the ordinance sets the ceiling, not the typical amount.

What a Replacement Involves

  • Removal of old boards and trim, with the roof below protected from dropped material and falling nails.
  • Sheathing check. Soft or delaminated sheathing behind the old boards is replaced. As with roof decking, it cannot be priced until exposed; ask for a per-sheet rate.
  • Weather barrier. New house wrap or equivalent, lapped and taped, with flashing at windows and at the roof-to-wall line. See flashing.
  • New planks and trim, usually fiber cement again, with corners, frieze boards and dormer cheeks cut to fit.
  • Caulk and paint, or factory-finished planks that need only touch-up.
  • The brick line. Where the new boards meet the top of the masonry, a drip or Z-flashing keeps water out of the wall cavity.

General trade practice. Fiber cement manufacturers publish installation requirements that govern their warranties.

Material Choices and the 2019 Law

The ordinance names fiber cement for the upper-story allowance, and fiber cement is what most of these houses carry. A 2019 Texas law, effective September 1, 2019, bars cities from enforcing rules that prohibit or limit building materials approved by a national model code published within the last three code cycles, with exceptions for historic districts and a few other cases. In plain terms, the city's ability to insist on fiber cement rather than another code-approved siding is narrower than the ordinance text alone suggests.

That is background, not advice. The practical rule is: ask the city's Planning or Building Inspections staff before quoting anything other than like-for-like, and ask your association regardless, because the state law does not touch private deed restrictions.

Texas Municipal League, H.B. 2439 (2019) Legal Q&A, read October 2026. City of Frisco Zoning Ordinance, Chapter 63, Subsection 4.07.09 (Ordinance 2021-07-47), as published on eCode360, read October 2026.

Not This Site's Job

The contractor replaces the siding; this site introduces the contractor.

No prices on this page. The quote is the price.

No insurance. This site has no role in filing, negotiating, adjusting or settling claims.

Questions on This Page

Does Frisco require a permit for siding replacement?

This site could not find a city page that says so either way. Call Plans and Permits at 972-292-5301 before the job starts.

Can I switch from fiber cement to something else?

The ordinance names fiber cement; a 2019 state law limits how cities restrict code-approved materials. Ask the city and your association before the quote is written for a different material.

Will the new boards match the brick and the neighbors?

Fiber cement comes in standard widths and textures; a close profile match is usual. Color is a paint decision and an association decision.

How long does it take?

Several days on a typical two-story house, longer if sheathing needs work or scaffold has to move around a roof.

Boards Past Patching?

Say which walls and whether the house is one story or two. The contractor brings the scaffold.

Call (469) 535-7696 Use the Form
Call (469) 535-7696 for a Frisco roof or siding jobSend the Details